Fiscal Year | Local Share | State Share | Federal Share | Total Project Cost | Project Description |
---|---|---|---|---|---|
1966 | $0.00 | $4,188.00 | $0.00 | $4,188.00 | Acquire land |
1973 | $0.00 | $0.00 | $39,000.00 | $39,000.00 | Pave and mark RW (3,000 x 60), TW and turnarounds; construct apron; install segmented circle and win |
1973 | $0.00 | $22,966.00 | $0.00 | $22,966.00 | Excavation and drainage for new asphalt RW, TW, and apron |
1977 | $0.00 | $168,299.00 | $0.00 | $168,299.00 | Overlay and mark RW and TW; install RW lights and rotating beacon (F,S,L participation) |
1980 | $0.00 | $26,400.00 | $0.00 | $26,400.00 | Repair and seal RW; mark RW and TW; install NDB |
1983 | $0.00 | $0.00 | $115,554.00 | $115,554.00 | Improve RW, TW, and apron |
1989 | $0.00 | $0.00 | $43,200.00 | $43,200.00 | Conduct Airport Master Plan study |
1990 | $156,859.00 | $50,000.00 | $0.00 | $206,859.00 | Phase 1 of extend and mark RW 17/35; install radio control MIRL |
1991 | $69,571.00 | $50,000.00 | $0.00 | $119,571.00 | Phase 2 of extend and mark RW 17/35; install radio control MIRL |
1992 | $52,100.00 | $50,000.00 | $0.00 | $102,100.00 | Overlay and mark RW 17/35 |
1994 | $8,000.00 | $32,000.00 | $0.00 | $40,000.00 | Install PAPI |
1996 | $28,400.00 | $113,600.00 | $0.00 | $142,000.00 | Reconstruct aircraft parking apron and stub TW |
1996 | $30,000.00 | $120,000.00 | $0.00 | $150,000.00 | Reconstruct aircraft parking apron and stub TW |
2000 | $0.00 | $70,000.00 | $0.00 | $70,000.00 | Install AWOS III T/P |
2002 | $5,556.00 | $0.00 | $50,000.00 | $55,556.00 | Construct Access Road |
2002 | $11,111.00 | $100,000.00 | $111,111.00 | Construct Apron | |
2002 | $5,556.00 | $50,000.00 | $55,556.00 | Construct Access Road | |
2003 | $17,900.00 | $0.00 | $161,100.00 | $179,000.00 | Rehabilitate runway, taxiway and apron |
2004 | $2,503.00 | $47,549.00 | $50,052.00 | Update airport master plan study | |
2007 | $9,889.00 | $187,900.00 | $197,789.00 | Conduct Miscellaneous Study [Project planning/formulation study for Line of Sight resolution and possible runway extenstion & airport development etc.] | |
2008 | $14,526.00 | $276,000.00 | $290,526.00 | Acquire Land For Approaches | |
2010 | $30,847.00 | $586,100.00 | $616,947.00 | Construct Taxiway [Design & Phase 1 Construct Parallel Twy] - - | |
2013 | $43,889.00 | $395,001.00 | $438,890.00 | Rehabilitate Apron | |
2014 | $47,203.00 | $896,859.00 | $944,062.00 | constructing an asphalt overlay on runway 17/35 | |
2016 | $14,698.00 | $132,278.00 | $146,976.00 | Install Weather Reporting Equipment | |
2017 | $8,147.20 | $73,324.80 | $355,538.89 | PER - Construct Taxiway | |
2017 | $260.00 | $2,340.00 | $2,600.00 | NEPA Documentation | |
2017 | $37,809.44 | $340,285.00 | $378,094.44 | Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 17/35, Reconstruct Runway Lighting - 17/35 | |
2018 | $19,807.00 | $178,263.00 | $198,070.00 | Construct Taxiway - Design | |
2019 | $163,650.00 | $163,649.00 | $2,945,691.00 | $3,272,990.00 | Constructing parallel taxiway |
Total |
$769,874.44 |
$1,776,368.20 |
$5,723,585.80 |
$8,543,895.33 |
National Plan of Integrated Airport Systems (NPIAS)
The National Plan of Integrated Airport Systems (NPIAS) identifies nearly 3,400 existing and proposed airports that are significant to national air transportation and thus eligible to receive Federal grants under the Airport Improvement Program (AIP). It also includes estimates of the amount of AIP money needed to fund infrastructure development projects that will bring these airports up to current design standards and add capacity to congested airports. The FAA is required to provide Congress with a 5-year estimate of AIP eligible development every two years.
The NPIAS contains all commerical service airports, all reliever airports and selected general aviation airports.
Future Capital Infrastructure Needs
2016-2020
Project Description | Addendum | Runway | Object Code | Airport Comp. | Const. Type | Project Cost |
---|---|---|---|---|---|---|
Construct T Hangars | T-hgrs | ST | BD | MS | $450,000.00 | |
Upgrade AWOS equipment | AWOS-upgrd | ST | EQ | WX | $90,000.00 | |
Construct Portion of Parallel Taxiway. | ST | TW | CO | $909,030.00 | ||
Crack Seal and Seal Coat, Joint Seal, Spall Patching | RE | AP | IM | $150,000.00 | ||
Construct north parallel taxiway | N. Parall | ST | TW | CO | $750,000.00 | |
Grading and fill. | RSA Impv | 17/35 | ST | RW | SF | $149,579.00 |
Install twy edge lights. | MITL | ST | TW | LI | $100,000.00 | |
Install new MIRLs | MIRL | 17/35 | ST | RW | LI | $100,000.00 |
Extend Rwy 17/35 south. | South | 17/35 | ST | RW | IM | $1,136,842.00 |
Joint Seal and Spall Patching | RE | TW | IM | $100,000.00 | ||
Construct New Hangar Access Taxilanes | CA | TW | CO | $550,000.00 | ||
Crack Seal and Seal Coat | RE | RW | IM | $450,000.00 | ||
Construct New Hangars | ST | BD | MS | $650,000.00 | ||
Total Cost: |